1.Fundamental Requirements for Die Design Checking
將進(jìn)行三輪模具設(shè)計(jì)校核:
1.1 The service supplier will carry out three rounds of die design checking:
模具設(shè)計(jì)校核基本要求
1. Cast check, 檢查
2. Steel check 鋼檢查
3. Final check 最后檢查
For each round the supplier need check the die design for adherence
對(duì)于每一輪,需要檢查模具設(shè)計(jì)是否符合要求。
? to the die manufacturing approval protocol MAP (FAP), which defines the materials to be used, etc. at the end of the method planning period.
對(duì)模具制造批準(zhǔn)協(xié)議MAP (FAP),在方法規(guī)劃期結(jié)束時(shí)定義要使用的材料等。
? to the requirements of Press-line and flow chart (DLP).
符合壓線和流程圖(DLP)的要求
? to warrant functionality and avoid collision risks in the die design.
保證模具設(shè)計(jì)的功能性并避免碰撞風(fēng)險(xiǎn)。
? to casting die design requirements (breakage, metal flow, etc.)
?符合鑄造模具設(shè)計(jì)要求(破損,金屬流動(dòng)等)
1.2 The verification of the die design will be based on a check list (DSCL) provided by VWA. The issues found shall be documented with pictures (screen shots) with an explanation using a VWA template. Recommendation to solve the issues shall be included (example: increase casting width, optimization of functionality, etc.)
模具設(shè)計(jì)的驗(yàn)證將基于VWA提供的檢查表(DSCL)。發(fā)現(xiàn)的問題應(yīng)以圖片(屏幕截圖)
記錄,并使用VWA模板進(jìn)行解釋。應(yīng)包括解決問題的建議(例如:增加鑄件寬度,優(yōu)
化功能等)
The results of the die design check might need to be discussed with VWA and the die manufacturer.
模具設(shè)計(jì)檢查的結(jié)果需要與VWA和模具制造商進(jìn)行討論。
Catia操作熟練。
More than 8 years experience in stamping mold design and audit.
8年以上沖壓模具設(shè)計(jì)和審核經(jīng)驗(yàn)。
Familiar with VW standard, VW porject experience is preferred.
熟悉大眾標(biāo)準(zhǔn),有大眾項(xiàng)目經(jīng)驗(yàn)者優(yōu)先。
Know well about mold desigh of body side, fender, aspect parts.
熟悉車身側(cè)面、擋泥板、車身外延件的模具設(shè)計(jì)。
工作地點(diǎn)最好天津,可居家辦公,全職兼職都可以